Talinga Fields

Projects

Origin Energy Talinga Fields

Well Site Upgrade and Separator Installation

Client: Origin Energy / Upstream Production Solutions (UPS) 

Duration: May 2020 – September 2020


Ison Contracting was the Contractor engaged to undertake well-site upgrades and separator installations of 12 lease pads in the Talinga Fields for Origin Energy. 


Ison’s scope of works included:

  • Construction of lease pad extensions
  • Live excavation and backfill for gas and water tie-in
  • Lease pad rehabilitation
  • Engaging and coordinating sub-contractor works for surveying and poly welding scope


Share by: